Page 1 of 5 123 ... LastLast
Results 1 to 10 of 49

Thread: Some things i ve been doing over the past 2 weeks...

  1. #1

    Default Some things i ve been doing over the past 2 weeks...

    Things i ve done in the past week really...

    1st off i have to thank everyone for all your help in all of this:

    Paul Langlie Lee Myles transmission for anything and everything!
    Mike, Bryan, Tommy Greg at GST constant support no matter what
    Devin at Speedelement came through as always
    Robispec for all your help along the way
    Yang for your support in this
    Indy evo and Fp for getting us a Red in 3 days
    Steve couldnt have done it without ur parts car
    Smack... mainly for the tq wrench....lol


    I need a lift and i hate cars.

    Pulled the head, installed head all new gaskets
    helicoiled a head to ex mani stud
    Installed Comp 280's
    Installed Wilson V2 intake mani
    hondadata gasket
    oil change
    new tranny fluid
    new transfer case fluid
    new rear diff fluid
    Installed TRE rear diff
    Installed AMS mustash bar elim kit
    cleared trailing arm to fir 285's
    rerolled rear fenders
    Fit 285/30/18 yoko advans
    installed new apr studs front and rear
    installed perrin lower caster adjustment
    installed swift front and rear springs
    intalled whiteline a arm bushings
    Steve ported a FPred
    Installed FP red
    installed all intercooler piping
    fixed cv boot band
    replaced RF axle
    replaced full interior
    installed S&S rear wing
    installed front aero
    cut more weight from car
    installed rc 1200cc injectors
    tried to install dump o2 housing
    installed agp intercooler
    installed titek o2 housing








    Indy intake mani V2



    yoko neova 285/30/18 stock rear fenders





  2. #2

    Default Re: Some things i ve been doing over the past 2 weeks...

    Robi camber/caster plates

    285 yokos vs 275 nt-01





    stevo8 porting



    for sale




    new studs




  3. #3

    Default Re: Some things i ve been doing over the past 2 weeks...















  4. #4

    Default Re: Some things i ve been doing over the past 2 weeks...








  5. #5

    Default Re: Some things i ve been doing over the past 2 weeks...

    nice work josh.
    car looks like it's coming together nicely

  6. #6

    Default Re: Some things i ve been doing over the past 2 weeks...

    Quote Originally Posted by smack
    nice work josh.
    car looks like it's coming together nicely
    Getting tuned tomorrow at GST... hopefully its strong (-:

  7. #7

    Default Re: Some things i ve been doing over the past 2 weeks...

    that's a lot of work! What rims? Those are sick!

  8. #8
    Join Date
    Jan 2007
    Location
    Bay Area, CA
    Posts
    6,896

    Default Re: Some things i ve been doing over the past 2 weeks...

    I'm stealing those CCW's tomorrow

  9. #9

    Default Re: Some things i ve been doing over the past 2 weeks...

    looks great!

  10. #10

    Default Re: Some things i ve been doing over the past 2 weeks...

    Quote Originally Posted by noypiC50
    that's a lot of work! What rims? Those are sick!
    18x10 ccw

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •